Loop Heat Pipe Anomaly Impacts on GOES-17 ABI Band 15
August 14, 2020
2 minute read
What is happening to Band 15?
Users of GOES-17 imagery from ABI Band 15 ("Dirty" Longwave Window IR) should begin to notice the degradation of the imagery as a result of the seasonal loop heat pipe anomaly. A visual representation of the anticipated daily impacts for Band 15 can be found here and in Figure 1, below. A "1" in a cell indicates some degree of degradation in the imagery for a given hour on a given day. The hour of day is at the top along the horizontal axis in UTC. The date is to the left along the vertical axis in ascending order.
Figure 1: Anticipated impacts for Band 15 from July 24 - September 7
and the vertical axis is the calendar date from July 24 to September 7, 2020 in ascending order.
Operational Impacts from Band 15 Degradation
Band 15 (12.3 µm) is the "Dirty Window IR" band on the ABI. As a "window" channel, there is little atmospheric absorption of energy in clear skies at this wavelength. In this band, the absorption and re-emission of water vapor, particularly in the lower troposphere, slightly cools most (non-cloud) brightness temperatures (BTs) compared to other IR window channels. If there is more water vapor, then the BT differences with respect to Band 15 are also greater. As a result, Band 15 and Band 13 (10.3 µm) are used to compute the well-known 'split window difference (SWD),' which can highlight both moisture and airborne dust. This channel therefore plays a significant role in a number of GOES baseline products, as shown in the list below. One impact of the loop heat pipe anomaly degradation to Band 15 includes a decreased ability to detect airborne dust (via the SWD), which may play a role in suppressing cyclogenesis. More information on Band 15 can be found in this quick guide from CIMSS and this article published in the Journal of Operational Meteorology.
The table below includes the GOES-17 data products that will be impacted by the degradation of Band 15. A quick guide for each data product is linked in the right column.
More Information on the Loop Heat Pipe Anomaly
For additional information regarding the GOES-17 Mode 3 cooling timeline operations, refer to the article linked here. Mark your calendars for Thursday August 20th at 12:00 p.m. EDT when Dave Pogorzala from the GOES-R Program will be presenting in the Satellite Book Club on various types of image artifacts and anomalies that can be seen in GOES-R ABI imagery, explain how and why they occur, and discuss what steps have been taken to address them. Stay tuned for more details on that session!
- 2023 Satellite Operation Communications
- 2022 Satellite Operation Communications
- 2021 Satellite Operation Communications
- 2020 Satellite Operation Communications
- Loop Heat Pipe Anomaly Impacts on GOES-17 ABI Bands 11 & 15 [October 15, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES-17 ABI Band 9 [October 13, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES-17 ABI Bands 8, 10, 12 & 16 [October 9, 2020]
- GOES-17 ABI Loop Heat Pipe Anomaly Fall Season Preview [October 7, 2020]
- GOES-17 Loop Heat Pipe Anomaly Summer Season Concludes [September 1, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES ABI Bands 13 & 14 [August 26, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES ABI Band 15 [August 14, 2020]
- GOES-17 Mode 3 Cooling Timeline Operations [August 10, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES ABI Band 11 [August 10, 2020]
- GOES-17 Loop Heat Pipe Anomaly Impacts Update [August 4, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES-17 ABI Band 8 [July 30, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES-17 ABI Band 10 [July 29, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES-17 ABI Bands 12 & 16 [July 24, 2020]
- GOES-17 Cooling System Impacts Update [July 22, 2020]
- GOES-17 Mode 3 Cooling Timeline Operations [April 3, 2020]
- GOES-17 Cooling System Impacts Update [April 3, 2020]
- Upcoming Deactivation of GOES-15 Operations and Products [February 27, 2020]
- GOES-W Scan Strategy Testing [February 18, 2020]
- GOES-17 Cooling System Impacts Update [February 5, 2020]
- 2019 Satellite Operation Communications
- GOES-W Scan Strategy Testing [December 9, 2019]
- Mode 6: GOES-E/W ABI Operational Flex Mode Transition to 10 Minute Cycle [March 29, 2019]
- GOES-W Yaw Flip Data Outage [March 27, 2019]
- GOES-R Satellite Series: Upcoming ABI Mode 6 Testing [February 19, 2019]
- GOES-R Satellite Series Mode 6 Testing and GOES-17 Imagery Anomalies [February 7, 2019]
- GOES-17 ABI Mode 6 Testing [January 25, 2019]
- GOES-17 Cooling System Impacts Update [January 17, 2019]
- 2017 Satellite Operation Communications