GOES-17 Loop Heat Pipe Anomaly Impacts Update
August 4, 2020
2 minute read
What is happening to Band 9?
Over the next few days, users of GOES-17 imagery from ABI Band 9 (Mid-level Water Vapor IR) will begin to notice the degradation of the imagery as a result of the seasonal loop heat pipe anomaly. A visual representation of the anticipated daily impacts for Band 9 can be found here and in Figure 1, below. A yellow cell with a "1" indicates estimated minimal to moderate degradation in the imagery for a given hour on a given day. Similarly, a red cell with a "2" indicates estimated severe degradation to the point that the imagery becomes unusable. The hour of day is at the top along the horizontal axis in UTC. The date is to the left along the vertical axis in ascending order.
Figure 1: Anticipated impacts for Band 9 from July 24 - September 7

and the vertical axis is the calendar date from July 24 to September 7, 2020 in ascending order.
Operational Impacts from Band 9 Degradation
Band 9 (6.95 µm) is the "Mid-level Water Vapor IR" band on the ABI. The "water vapor" bands are IR bands that sense the mean temperature of a variable-depth layer of moisture. For some tropical air masses, Band 9 may sense temperatures characteristic of the environment at pressures lower than 500 hPA (e.g. higher heights). In other dry or cold atmospheres, the satellite may sense at pressures higher than 500 hPa (e.g. lower heights), but surface features are not usually apparent in this band. It has many of the same applications as the other two water vapor bands. The impact of the loop heat pipe anomaly degradation to this band includes decreased ability to identify mountain waves, which may be more evident in this band than in the other two water vapor bands. More information on Band 9 can be found in this quick guide from CIMSS and this article published in the Journal of Operational Meteorology.
Impacted Data Products
The table below includes the GOES-17 data products that will be impacted by the degradation of Band 9. A quick guide for each data product is linked in the right column.
Data Product | Link to Quick Guide |
---|---|
Clear Sky Mask | CIMSS Quick Guide for Clear Sky Mask |
Derived Motion Winds | CIMSS Quick Guide for Derived Motion Winds |
Derived Stability Indices | CIMSS Quick Guide for Derived Stability Indices |
Legacy Vertical Moisture and Temperature Profiles | CIRA Quick Guide for Legacy Vertical Profiles |
Total Precipitable Water | CIRA Quick Guide for Total Precipitable Water |
Sulfur Dioxide (SO2) RGB | CIRA Quick Guide for SO2 RGB |
Split Water Vapor Brightness Temperature Difference | CIMSS Quick Guide for Split Water Vapor Difference |
Supplemental GOES-15 Operations
From August 9 at 0000 UTC through September 3 at 1600 UTC, NESDIS will return the GOES-15 imager to temporary service for additional support purposes for Eastern Pacific tropical cyclones by providing imager only coverage. The GOES-15 operating position will be at 128 degrees west. GOES-17 will continue operating in the GOES-West role at 137.2 degrees with all instruments operating nominally. GOES-15 will be running a routine west schedule. For AWIPS users, GOES-15 imagery bands will once again update under the main Satellite Menu (e.g. IR Window, Water Vapor, Visible, 3.9u). Read the full message on the upcoming supplemental GOES-15 operations from the Office of Satellite and Product Operations (OSPO) here.
More Information on the Loop Heat Pipe Anomaly
For additional information regarding this seasonal loop heat pipe anomaly event, including the upcoming GOES-17 Mode 3 cooling timeline operations, refer to the article linked here. Mark your calendars for August 20th when Dave Pogorzala from the GOES-R Program will be presenting in the Satellite Book Club on the loop heat pipe anomaly. Stay tuned for more details on that session!
- 2023 Satellite Operation Communications
- 2022 Satellite Operation Communications
- 2021 Satellite Operation Communications
- 2020 Satellite Operation Communications
- Loop Heat Pipe Anomaly Impacts on GOES-17 ABI Bands 11 & 15 [October 15, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES-17 ABI Band 9 [October 13, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES-17 ABI Bands 8, 10, 12 & 16 [October 9, 2020]
- GOES-17 ABI Loop Heat Pipe Anomaly Fall Season Preview [October 7, 2020]
- GOES-17 Loop Heat Pipe Anomaly Summer Season Concludes [September 1, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES ABI Bands 13 & 14 [August 26, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES ABI Band 15 [August 14, 2020]
- GOES-17 Mode 3 Cooling Timeline Operations [August 10, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES ABI Band 11 [August 10, 2020]
- GOES-17 Loop Heat Pipe Anomaly Impacts Update [August 4, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES-17 ABI Band 8 [July 30, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES-17 ABI Band 10 [July 29, 2020]
- Loop Heat Pipe Anomaly Impacts on GOES-17 ABI Bands 12 & 16 [July 24, 2020]
- GOES-17 Cooling System Impacts Update [July 22, 2020]
- GOES-17 Mode 3 Cooling Timeline Operations [April 3, 2020]
- GOES-17 Cooling System Impacts Update [April 3, 2020]
- Upcoming Deactivation of GOES-15 Operations and Products [February 27, 2020]
- GOES-W Scan Strategy Testing [February 18, 2020]
- GOES-17 Cooling System Impacts Update [February 5, 2020]
- 2019 Satellite Operation Communications
- GOES-W Scan Strategy Testing [December 9, 2019]
- Mode 6: GOES-E/W ABI Operational Flex Mode Transition to 10 Minute Cycle [March 29, 2019]
- GOES-W Yaw Flip Data Outage [March 27, 2019]
- GOES-R Satellite Series: Upcoming ABI Mode 6 Testing [February 19, 2019]
- GOES-R Satellite Series Mode 6 Testing and GOES-17 Imagery Anomalies [February 7, 2019]
- GOES-17 ABI Mode 6 Testing [January 25, 2019]
- GOES-17 Cooling System Impacts Update [January 17, 2019]
- 2017 Satellite Operation Communications