Create a New Procedure - OCLO
- 01- CAVE Fundamentals
- Setting the Time Match Basis of a Product
- Loading and Toggling Radar Graphic Overlay Products
- Overlaying CAPE on a Base Reflectivity Product
- Overlaying a Surface Plot on a Base Reflectivity Product
- Overlaying Model Image on Radar and Satellite
- Transferring Screen Products Between the Main Display Pane and Side Panes
- Loading, Arranging, Renaming, and Unloading Additional Map Editors
- Zooming In or Out of a Product View
- Panning a Zoomed-In Image in the Main Display Panel
- Switching the Color Table for a Radar Image Product
- Editing the Current Color Table
- Unload a Map Overlay
- Loading a Map Overlay
- Changing a Map's Display Characteristics
- Loading the Alphanumeric Information for a VWP Product
- Using the AFOS Browser to Load an Area Forecast Discussion
- Move and Adjust Width of AlertViz
- Launch Text Section Log and Display Detailed View
- Loading and Using the AWIPS Data Monitor
- Blinking a Range of Data Values
- Printing the Contents of the Main Display Panel
- Creating a Screen Capture of the Main Display Panel
- Saving/Loading Editor and Perspective Displays
- 02- D2D Fundamentals
- Create a New Procedure
- Opening an Existing Procedure
- Load a Product from the Product Inventory
- Clearing a Product from the Main Display Panel
- Manually Toggling and Looping Single Elevation Angle Products in Time
- Create an Image Combination and Toggle Between the Images
- Use Panel Combo Rotate and All Panel Sample on Dual Pol
- 03- D2D Radar
- Load Radar Products for Single Radar and Radar/MRMS Mosaics
- Toggling Product Displays
- Viewing Radar Cursor Readout Information
- Loading Products into Four-Panel Displays
- Submit an OTR for a Three Hour Precip (THP) Product
- Build a New Request in the RMR GUI
- Managing Active Requests in the RMR GUI
- Loading an All Tilts Product into the Main Display Panel
- Load a VWP Hodograph
- Load a Vertical Reflectivity Cross-Section Image Product Using the Volume Browser
- Load a Horizontal Reflectivity Cross-Section Image Product Using the Volume Browser
- 04- D2D Satellite
- 05- D2D Upper Air
- Load NSHARP into your CAVE Display
- Change NSHARP Configurations
- Cycling Through the Tables
- Toggling Display Insets
- Toggling Graphs and Statistics
- Interact with the Inventory in the D2D Skewt Standard Screen Configuration and Use Keyboard Shortcuts
- Configuring a Sounding and Hodograph Display
- Changing the Parcel Lifting Method
- Display Multiple Active Soundings
- 06- D2D Tools
- 07- D2D Applications
- Issue A New Severe Thunderstorm Warning
- Follow Up a Severe Thunderstorm Warning with a Severe Weather Statement
- Loading an FFMP Basin Trend Graph and Downstream Basin Trace
- Assessing QPE, Ratio, and Diff
- Closing the FFMP Table
- Loading the FFMP Basin Table
- Loading a SCAN Storm Cells Table
- Interacting with the SCAN Storm Cells Table
- Launching the MESO and TVS Tables
- Closing the SCAN Cell Table
Purpose:
This task demonstrates how to create a new procedure and add a new bundle to that procedure.Tasks:
- Load one or more products into the main display panel (see Lesson 1).
- Load any additional maps into the main display panel (see Lesson 3).
- Edit the display characteristics (i.e., color table, graphic colors, Magnification, etc.) for the products and maps in the main display panel (see Lessons 2 & 3).
- Take time to change the display traits of graphic overlay products and maps prior to saving the procedure. Make use of the different colors and line styles available, using brighter colors and thicker (or solid) lines for items you want to stand out more. Use thin lines for reference information and to reduce clutter.
- If you have several graphic or map overlays loaded in the main display, consider toggling some of them off prior to creating the procedure. This way, the overlays are available in the procedure, but initial clutter in the display is reduced.
- Open the New Procedures GUI using one of the following methods:
- Method 1: Using the File menu.
- From the File menu, select Procedures.
- In the sub-menu that appears, select New.
- Method 2: Using the keyboard shortcut <CTRL> + N.
- Method 1: Using the File menu.
- Add a bundle to the New Procedure GUI.
- In the Procedure GUI that appears, left-click on the Copy In button.
- Left-click on the bundle you copied in.
- Left-click on the Rename... button.
- In the Enter Bundle Name window enter a name for the bundle that is readable in a small window.
- You can move procedures up or down in the list using the Up and Down buttons if you have lots of bundles, and you can delete bundles using the Delete button.
- You can alter existing bundles to use other radars, models, points, and lines using the Alter button (and selecting the appropriate check box), and then save those bundles with the new characteristics.
- Left-click the Save or Save As... button.
- In the Save Procedure As window that appears, enter the name you want to assign to the new procedure, then left-click the OK button.
- The procedure window, originally titled Procedure (untitled), should now be titled Procedure (procedure_name), where procedure_name is the name you just gave the new procedure.
- You can continue creating new bundles in this procedure or you can select the Close button.
- You can open up your new procedure and new bundle under your USER in the open procedures window (step 2).
- Task Complete!